Quality, professional service, and a reliable roof are the hallmarks of Reliable Roofing. We deliver peace of mind through our expertly-designed roofing systems and superior installation and maintenance. Contact us for a free inspection of your roof.
Edge repair of large warehouse in Chicago Metro area. The structural roof perimeter was never properly attached to the building perimeter structure.Reliable Roofing technicians discovered the problem, hired a structural engineer and performed the repair per the engineer’s repair specifications. Pic 2 shows all details of the engineer’s specified repair with proper attachement of the roof perimeter to the building’s steel structure.650 W Grand Ave, Elmhurst650 W Grand Ave, Elmhurst801 Skokie Blvd, Evanston2855 N Hamlin Ave, Chicago2949 Fullerton Ave, ChicagoIndustrial Roofing Reliable-Roofing Chicago ILCarol Stream Salt DomeChampaign Town CenterRoof Installation and Repairs – Chicago, ILEmmetts Brewing Co West DundeeReliable RoofingReliable Roofing
Commercial Roofing Projects – BeforeCommercial Roofing Projects – After
Damaged RoofDamaged Roof InsulationRepairing Damaged RoofNew Insulation InstallationRoof penetrations are the most common leak point. In this repair, the plumbing stack (vent pipe) was installed but not properly flashed and waterproofed. This cause regular leaking around this pipe penetration.The Reliable Roofing repair technician chose to install a lead pipe flashing to fix this leak. He prepped a proper lead pipe flashing for installation over the pipe on top of the roof membrane. The lead was formed to fit over the plumbing stack. A layer of roofing cement was spread on the bottom of the pipe flashing and the perimeter of the flashing collar.The pipe flashing was set in place and a target patch of modified bitumen roofing membrane was installed over the flashing collar. The plumbing vent stack is now watertight.Completed Roof Repair Job
Rooftop Unit Installation Projects – Before and After
Steel roof deck patched as needed to provide safe work spaceNew HVAC unit curb set in place.New HVAC curb anchored in place.Roof deck opened per mechanical contractor specification.New HVAC curb is isulated to prepare for roof membrane and flashing.Curb is flashed with roofing membrane and tied into existing roof system.Completed flashing and tie in – curb is covered with plywood for safety until mechanical contractor places new HVAC unit.
TPO and EPDM Roofing Materials Training Event
Our team doing hands on TPO and EPDM training with one of our Roofing Manufacturers. At Reliable Roofing, we believe ongoing training and education is important for our advanced and reliable team of roofing experts. Through determination, training, and great personalities, our technicians can handle all aspects of the roofing service.
TPO EPDM Roofing Materials TrainingRoofing Materials Training Reliable RoofingProfessional Roofing Manufacturer’s Training
Kinzie Builders Project in Mount Prospect
Almost dried-in on another great project for Kinzie Builders in Mount Prospect.
Almost dried-in on another great project for Kinzie Builders in Mount Prospect